| Case Study- Clyde Bergemann Atlanta Quality Management System |
|
|
 |
|
|
| Clyde Bergemann Presents Progress Energy Mayo Station Case Study at Electric Power 2011 Conference |
|
Ati Manay, SMART Clean™ Product Manager at Clyde Bergemann, Inc, presented at the Electric Power 2011 Conference which was held May 10-12 in Rosemont, Illinois.
Ati’s presentation “SCR Temperature Control with the Inte
 |
|
| Clyde Bergemann Power Group awarded contract for first DRYCON™ dry bottom ash systems in the U.S. |
|
Atlanta, GA/USA, April 2011
Clyde Bergemann Power Group Americas headquartered in Atlanta/GA has been awarded a contract to supply both the engineering and equipment to convert the existing wet bottom ash removal system of Seminol
 |
|
| Clyde Bergemann Atlanta achieves ISO 9001:2008 certification |
|
Atlanta, Georgia/USA, February 2011
Clyde Bergemann Atlanta (CBA) has earned ISO 9001:2008 certification. CBA demonstrated compliance with the updated standards for quality management systems set forth by the International Organ
 |
|