 |
| CEOS - TDM |
 |
With CEOS – TDM*, the entire power plant process is illustrated and thermodynamically balanced. In doing so, the process parameters of the individual power plant components are presented in a logical model that illustrates the process. For a detailed process evaluation, heat and mass flow are balanced in real-time, temperature profiles and air consumption are calculated and fuel and flue gas mass flow are evaluated. Furthermore, a comparison between original boiler design and current operation is carried out in real-time. Measured data, such as temperature or volume flow is validated and subjected to a plausibility check.
CEOS – TDM recognizes weak points in the steam generation process during operation, evaluates these and shows the most economical countermeasure.
* TDM = Thermodynamic Modelling |
 |
|